LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Dodge and Ram >> 2018 >> Charger Pursuit, 5.7L Eng VIN T, 4WD >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> 5.7L Engine (Service Information) >> Valve Timing >> TENSIONER, Engine Timing >> Removal

TENSIONER, Engine Timing: Removal

  1. Disconnect and isolate the negative battery cable.
  2. Remove the timing cover. Refer to COVER(S), ENGINE TIMING, REMOVAL  .
    GC0088129Courtesy of CHRYSLER GROUP, LLC
  3. Retract the chain tensioner arm (1) until the hole in the arm lines up with the hole in the bracket.
    GC0088063Courtesy of CHRYSLER GROUP, LLC
  4. Install the Tensioner Pin (special tool #8514, Pins, Tensioner) (1) into the chain tensioner holes.
  5. Remove bolts (3) and the timing chain tensioner (2).