LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Dodge and Ram >> 2018 >> Charger Pursuit, 5.7L Eng VIN T, 4WD >> Repair and Diagnosis >> Heating, Ventilation & A/C (HVAC) >> A/C Compressor >> Heating & Air Conditioning (Service Information) >> Distribution >> Duct, Floor Distribution >> Installation >> Front

Duct, Floor Distribution: Installation: Front

GC0144758Courtesy of CHRYSLER GROUP, LLC
  1. Position the front floor distribution duct (3) to the bottom of the HVAC air distribution housing (2).
  2. Install the six screws (1) that secure the front floor distribution duct to the air distribution housing. Tighten the screws securely.
  3. Install the air distribution housing. Refer to HOUSING, HVAC, INSTALLATION .