Tubes And Hoses, Transmission Oil Cooler: Installation
- Install rear transmission cooler lines at transmission. Tighten fittings to 20 N.m (18 ft. lbs.).
- Install rear transmission cooler lines to thermal bypass valve. Tighten fittings to 20 N.m (18 ft. lbs.).
- Install front transmission cooler lines to thermal bypass valve. Tighten fittings to 20 N.m (18 ft. lbs.).
- Install front transmission cooler lines into transmission cooler. Refer to STANDARD PROCEDURE .
- Lower vehicle.
- Check transmission fluid level. Refer to FLUID AND FILTER, STANDARD PROCEDURE .