LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Dodge and Ram >> 2018 >> Charger Pursuit, 5.7L Eng VIN T, 4WD >> Repair and Diagnosis >> Engine Mechanical >> Cooling Fan >> Cooling System >> Supercharger System >> Manifold, Coolant Crossover >> Installation

Manifold, Coolant Crossover: Installation

GC0170350Courtesy of CHRYSLER GROUP, LLC
  1. Using a non-petroleum based lubricant, lubricate the

    NEW 

    O-ring seals and O-ring pockets of the coolant crossover manifold.

  2. Install the coolant crossover manifold and tighten the bolts (1) to the proper torque specifications. Refer to TECHNICAL SPECIFICATIONS .
    GC0170562Courtesy of CHRYSLER GROUP, LLC
  3. Install the Low Temperature Radiator (LTR) circuit hoses (1) onto the coolant crossover tube.
    GC0170369Courtesy of CHRYSLER GROUP, LLC
  4. Connect the charger air cooler temperature sensor (2) wire harness connector (1).
  5. Install the cowl cover panel. Refer to COVER, COWL PANEL, INSTALLATION .
  6. Fill the cooling system. Refer to STANDARD PROCEDURE .
  7. Connect the negative battery cable.
  8. Start vehicle and check for cooling system leaks.