LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Dodge and Ram >> 2018 >> Charger Pursuit, 5.7L Eng VIN T, 4WD >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> 5.7L Engine (Service Information) >> Cylinder Head >> Rocker Arm, Valve >> Installation

Rocker Arm, Valve: Installation

GC0081766Courtesy of CHRYSLER GROUP, LLC
CAUTION:

The longer pushrods are for the exhaust side and the shorter pushrods are for the intake side.

  1. Install the push rods in the same order as removed.
  2. Install the push rod retainer (special tool #9070, Retainer, Push Rod) (1).
    GC0088046Courtesy of CHRYSLER GROUP, LLC
    CAUTION:

    Make sure that the retainers (1) and the rocker arms (2) are not overlapped when tightening bolts or engine damage could result.

    CAUTION:

    Due to the changes in the pushrod clearance holes in the Eagle 5.7L cylinder heads, close attention must be given when installing the pushrod(s) into the tappet(s). Once the pushrod(s) have been installed, use a suitable light to look down through the pushrod hole(s). This will allow you to verify the pushrod(s) are centered properly in the tappet(s) and avoid engine damage. Recheck after the rocker shaft assembly has been installed and tightened to specification.

    GC0088045Courtesy of CHRYSLER GROUP, LLC
    CAUTION:

    The rocker shaft assemblies are not interchangeable between the intake and the exhaust, failure to install them in the correct location could result in engine damage. The intake rocker arms (1) are marked with the letter "I" (2).

    Fig 1: Rocker Shaft Retaining Bolt Tightening Sequence
    GC0088038Courtesy of CHRYSLER GROUP, LLC
  3. Install the rocker arm shaft assemblies in the same order as removed.
  4. Using the sequence shown, tighten the rocker shaft bolts as follows:
    • Snug to 10 N.m (7 ft. lbs.)
    • Torque to 23 N.m (17 ft. lbs.)
    • Individually loosen by 1/2 turn and re-torque to 23 N.m (17 ft. lbs.)
    • Finally, Rotate 30 degrees
    CAUTION:

    Do Not rotate or crank the engine during or immediately after rocker arm installation. Allow the hydraulic roller tappets adequate time to bleed down (about five minutes).

    GC0081766Courtesy of CHRYSLER GROUP, LLC
  5. Remove pushrod retainer (special tool #9070, Retainer, Push Rod) (1).
  6. Install the cylinder head cover. Refer to COVER(S), CYLINDER HEAD, INSTALLATION  .
    GC0143807Courtesy of CHRYSLER GROUP, LLC
  7. Install the engine cover (2).
  8. Connect the negative battery cable (1).