LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Dodge and Ram >> 2018 >> Charger Pursuit, 5.7L Eng VIN T, 4WD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 2 (6.4L Engine (Service Information)) >> Valve Timing >> Cover(S), Engine Timing >> Installation

Cover(S), Engine Timing: Installation

WARNING: This page is about a different variant/trim than selected.
GC0081832Courtesy of CHRYSLER GROUP, LLC
  1. Clean the engine timing cover and engine block surface.
    NOTE:

    Always install a NEW gasket when servicing the engine timing cover.

  2. Verify that the engine timing cover slide bushings (1) remain located in the engine timing cover.
    GC0170155Courtesy of CHRYSLER GROUP, LLC
  3. Using a new gasket, install the engine timing cover and tighten the retaining bolts (1) to the proper specification. Refer to TORQUE SPECIFICATIONS  .
    GC0144561Courtesy of CHRYSLER GROUP, LLC
  4. Install the oil pump pickup tube (2) and the oil pan. Refer to PAN, OIL, INSTALLATION  .
  5. Install the lower radiator hose and clamp.
  6. Install the vibration damper onto the crankshaft. Refer to DAMPER, VIBRATION, INSTALLATION .
  7. Install the generator. Refer to GENERATOR, INSTALLATION, 5.7L AND 6.4L .
  8. Install the A/C compressor. Refer to COMPRESSOR, A/C, INSTALLATION .
    GC0148461Courtesy of CHRYSLER GROUP, LLC
  9. Connect the camshaft position sensor wire harness connector (1).
    GC0144611Courtesy of CHRYSLER GROUP, LLC
  10. Install the heater tube (3) into of the water pump.
  11. Install the heater tube retaining bolt (1) and tighten to the proper specification. Refer to TORQUE SPECIFICATIONS  .
  12. Connect the coolant temperature sensor wire harness connector (2).
    GC0170081Courtesy of CHRYSLER GROUP, LLC
  13. Install the oil cooler hose and clamp (2).
  14. Install the upper radiator hose and clamp (1).
  15. Fill the cooling system with the specified type and amount of engine coolant. Refer to STANDARD PROCEDURE .
  16. Change the engine oil filter and fill the crankcase with the specified type and amount of engine oil. Refer to OIL  .
  17. Connect the negative battery cable.
  18. Perform the Refrigerant System Charge procedure. Refer to PLUMBING, STANDARD PROCEDURE .
  19. Start the engine and check for leaks.